So...it has been a while since I showed some of the progress on the house...needless to say...A LOT has happened since I last took pictures. Here is the rundown:
HVAC - Done
Electrical - Done
Plumbing - Done
Windows - Done
Roof - Done
Insulation - Done (except the loose fill stuff they will blow into the attic)
and we are cleared for sheetrock and siding starting MONDAY!!!! (Which is April 9th)
View up the stairs to the 3 bedrooms and two baths.
View from the dining area into the kitchen
View of Great room (and Brady) complete with the fireplace installed even!
View of the downstairs Family room. To the left is the 5th bedroom and bathroom. To the right will be the wetbar and slider to the backyard. We will have a walk-out basement!
View up the stairs to the 3 bedrooms and two baths.
View from the dining area into the kitchen
View of Great room (and Brady) complete with the fireplace installed even!
View of the downstairs Family room. To the left is the 5th bedroom and bathroom. To the right will be the wetbar and slider to the backyard. We will have a walk-out basement!
Things are happening super fast. The siding and outside window trim will be going up this week too and hopefully the porch and deck with be built too. The sheetrock and mudding/taping will take about two weeks then PAINT!!! We have finalized all the flooring and cabinets are being made too. We also ordered the counter tops and all the plumbing fixtures. And we have purchased lights. We still have about two months, but that's nothing!
On another note...the house we are renting has sold and we have to be out by May 1. Isn't life great!!! And our house isn't going to be done until mid-June. We have found a potential short term rental through our bishop here and hopefully that will work out. Otherwise who knows!!! We might be living in our tent for a couple months! Ha Ha Ha!